PIPING AND PLANT DESIGN DEPARTMENT IS BASED ON 3 MAIN SECTIONS: -DESIGN TEAM – STRESS ANALYSIS AND SUPPORT TEAM – MATERIAL TEAM DESIGN TEAM WILL CONSIDER ALL LAYOUT ITEMS SUCH AS MAIN OVERAL PLOT PLAN, REQUIRED ROADS, EQUIPMENTS AND STRUCTURES LOCATIONS, MAINTENACE POSSIBILITY, PLANT SUITABLE OPERATION PARAMETERS, PASSING WAY AND ESCAPE ROUTES FOR OPARATORS, PIPING ROUT BETWEEN EQUIPMENTS, UTILITY FACILITIS, SUITABLE ACCESS TO INSTRUMENTS, HEAD ROOM CLEARANCE, CLASH BETWEEN ALL ITEMS,…WILL BE CHACK IN 3D MODEL SOFT WARE(PDMS) BEFORE CONSTRUCTION. STRESS ANALYSIS TEAM WILL CONSIDER STRESS IN PIPE SECTION DUE TO TERMAL AND SUSTAINED AND OCCATIONAL LOADS. PIPES WHICH HAVE BEEN CONNECTED TO NOZZLES WILL BE CHECKED BY MENTIONED SECTION AND ALSO REQUIRED SUPPORT WILL BE DESIGN. MATERIAL TEAM WILL SPECIFY PIPE AND EQUIPMENT MATERIAL. INSULATION PROPERTY AND PAINT SPECIFICATIONS, WELDING AND NDT, PIPING MATERIAL SPECIFICATION AND TAKE OFF WILL BE SUBMITTED BY THIS SECTION BASED ON 3D MODEL REPORT